seism
英
美
网络 地震
英英释义
noun
- shaking and vibration at the surface of the earth resulting from underground movement along a fault plane of from volcanic activity
双语例句
- Since the weight of the aqueduct together with its inside water is very heavy, the dynamic response of the structure is intensive under the seism action.
渡槽结构由于上部水体及槽体重量大,地震时动力反应强烈。 - This paper discusses the vibration velocity of blasting seism and the reaction chart of the blasting vibration, and offers some helpful suggestions about solving engineering blasting problems.
对爆破地震的振动速度与爆破振动反应谱进行了分析和探讨,为解决工程爆破问题提供了参考意见。 - Static analysis subject to wind and seism load is done and the behavior of frame-brace steel-concrete hybrid structure is investigated.
进行了风荷载和地震荷载下的静力分析,探讨了框架-支撑钢-混凝土组合结构在各种荷载作用下的受力性能。 - So the crustal stability of NorthwestYunnan is determined dominatingly by the active fault and seism.
因此发现该区地壳稳定性主要受活动断裂和地震这两类因素的控制。 - Seism special processing and predict gas reservoir distribute scopes and distribute areas.
利用地震特殊处理资料,预测气藏分布范围和分布面积。 - Firstly, seism CT method was used to detect the defects of the engineering geology of the tunnel.
首先通过地震CT手段对该连拱隧道出现的工程地质病害进行探测; - In order to reflect the true state under seism about the long-span composite truss frame, the analysis should embody the initial influence of static loads.
为了准确反应大跨组合网架在结构地震作用下的真实状态,必须考虑初始静载影响下的网架时程分析。 - Multi-vibroseis assembled seism method is limited with amount and not be able to explore steep stratum.
针对采用多个震源同时工作的组合地震勘探,仍有所使用的震源数目受限,不适于大倾角地层勘探的问题,提出了一种产生定向地震波的方法。 - Study on Thorpe Seism Preventing and Disaster Reducing Planning in New Countryside Construction
新农村建设中村庄防震减灾规划问题研究 - 4-D seism, also known as time-delay 3-D seism, is a new technique for reservoir development and management.
四维地震,即时延三维地震,是近年来发展起来的一项储层开发和管理新技术。
