看词语>英语词典>quoin翻译和用法

quoin

n.  (房屋的)突角,外角;(墙壁接合处的)隅石;楔子;楔形支持物
v.  用楔子支持;打楔子固定(夹紧)

复数:quoins 

英英释义

noun

  • (architecture) solid exterior angle of a building
      Synonym:corner
    1. the keystone of an arch
        Synonym:coigncoigne
      1. expandable metal or wooden wedge used by printers to lock up a form within a chase
          Synonym:coigncoigne

        双语例句

        • The information technology already permeated the modern business management each quoin.
          信息技术已经渗入到现代企业管理的每个角落。
        • The international retail sales giant's already wove own retail sales network on the world each quoin, China is not exceptional.
          国际零售巨头已经将自己的零售网络编织到世界的每一个角落,中国也不例外。
        • Firstly the development of the passive acoustic detecting system and the study status in quoin the world are discussed.
          论文首先对被动声探测定位系统的发展背景及国内外研究现状进行了论述,在论述了其研究必要性的基础上,对被动声探测定位系统的理论知识进行了研究。
        • This article also discusses the problems and challenges of the system by arranging and analyzing the status quoin all of the countries.
          此外,并透过整理分析全国各县市实际执行之现况,探讨该制度所面临的问题与挑战。
        • The legalization of prostitution would alter the status quoin which China's sex industry is allowed to exist illegally under the protection of authorities, thereby reducing state authority corruption;
          卖淫合法化可以改变我国性服务行业长期受公权力庇护而得以非法存在的现状,减少国家权力腐败;
        • Condorcet and IRV let us compare the overall winner with the status quoin that way.
          孔和通气,让我们比较总冠军现状的方法。
        • In world any quoin, so long as has the place which the object exists, the spatial field is presenting inexhaustible rich.
          世界上任何一个角落,只要有物体存在的地方,空间场就呈现着无穷无尽的丰富性。
        • Vocational Education with the status quoin personal opinion, teaching skills for the future of NC provides new ideas and strategies.
          结合中职教育的现状提出个人的看法,为以后的数控技能教学提供了新的思路和策略。
        • The results of load test showed when a load within design scope passed the bridge, the biggest quoin of bridge face center in the measure point was 1 ° 02 ′ 44.7 ″.
          荷载试验检测结果显示,当设计荷载内的荷载通过该桥时,检测点中桥面的最大转角为1°02′447〃,表明桥身侧向稳定性好。
        • The second problem is the status quoin Washington, DC.
          第二大问题是华盛顿的现状。