fastenings
英 [ˈfɑːsnɪŋz]
美 [ˈfæsənɪŋz]
n. (尤指衣服的)扣处,扣法
fastening的复数
柯林斯词典
- N-COUNT 紧固件;扣件
Afasteningis something such as a clasp or zip that you use to fasten something and keep it shut.- The sundress has a neat back zip fastening.
这件背心裙背部有一个巧妙的拉链。
- The sundress has a neat back zip fastening.
双语例句
- The unballasted track railway line must meet the strict requirements of ground settlement, differential settlement and flex deformation, and adjustment of line can only go on through the rail fastenings system.
无砟轨道线路状态的调整只能通过扣件系统进行,其对轨下的基础沉降、差异沉降及弯折变形提出严格要求。 - The Technical Specification'Design of Fastenings for Use in Concrete'includes the local transmission of loads into the structure.
“混凝土用紧固件设计”技术标准包括荷载向结构内部的局部传递。 - Research purposes: The purpose is to make the researches on the structural types of rail fastenings for ballastless track and their key technologies, and to propose the technical development thoughts and concrete design of rail fastenings for passenger dedicated railway line in China.
研究目的研究无碴轨道扣件结构型式和关键技术,提出我国客运专线扣件技术发展思路和具体设计建议。 - The flexible connecting bolts are important fastenings connecting the DEMAG converter shell with its trunnion ring.
柔性螺栓是DEMAG公司制造的某炼钢厂转炉中连接托圈和炉壳的非常重要的联结装置。 - It introduced the design of plastic fastening piece by injection moulding, including the material selection, fastening principles, basic types, and the key points of dimensions and shape as well as the applications of fastenings.
介绍常用注塑成型连接件的材料选择、连接原理、基本类型、尺寸和形状设计要点及实际使用情况等。 - CONCRETE SOLID BED FOR RAILWAY TUNNEL The Contrast Test between Rail Vibration Absorber Fastenings and Elastic Shoe Monolithic Track Bed
隧道整体道床断面的研究轨道减振器扣件与弹性套靴整体道床减振对比试验 - Research on Fatigue Life Dispersivity in Bolted Fastenings
螺栓连接件剪切疲劳寿命分散性试验研究 - As one of post-installed fastenings, post-installed rebars are widely used in reinforcement and reconstruction engineering.
植筋作为后锚固技术的一种,广泛应用于加固改造工程中。 - Faceplates and buttons shall have temper-proof fastenings at all floors.
所有楼层面板和按钮应具有防火的连接件。 - Following the installation of the temporary support, on both side of RC column, we set steel column to which the upper loads could be transmitted by a node made by using the post-installed fastenings technology.
在迅速设置了临时支撑后,我们在柱两侧增设钢柱,并应用后锚固技术制作转换节点,将上部荷载传递到增设的钢柱上。
